West Camden Water Treatment Plant
2021/2024
UPGRADE OF TREATMENT PLANT
Downer-BMD JV – $14.9 million
- Bulk Excavation of 90,000 m3
- Removal of General Solid Waste
- Supply and filling of 75,000 Tons of DGS40 for Sub Grade
- Asbestos Management and Disposal of 10,800 m3
- Permeate Outfall 1000mm Pipe with Flow Meter and Tie into Concrete Structures
- Form Reo Pour Flowmeter Pit 4 X 5m X 4.5m Deep
- Equalization Basin 1000mm Pipework and Tie In
- Chemical Dosing Lines and Testing
- Recycled Effluent Pipe and Testing
- Electrical Conduits and Precast Pits