Moore Bank Units Relocation Project

 

2011 – 2012

John Holland $1.8milliion                   

  • Open Cut 2500m of Stormwater
  • Lay pipe from 375mm to 1200mm
  • Install Stormwater Quality Improvement Device
  • During this installation over 200 precast pits were installed
  • Our Excavations Varied in Depth from 7.5m to 900mm