Moore Bank Units Relocation Project
2011 – 2012
John Holland $1.8milliion
- Open Cut 2500m of Stormwater
- Lay pipe from 375mm to 1200mm
- Install Stormwater Quality Improvement Device
- During this installation over 200 precast pits were installed
- Our Excavations Varied in Depth from 7.5m to 900mm