Malabar Waste Water Treatment Plant
2013 – 2014
PLANT UPGRADE WORKS
Sydney Water – 4 Malabar Alliance $1.6m
- 8000m3 Bulk Excavation Works – Grit and Screenings
- Detailed Excavation and Subgrade Preparation for Roads
- Exhuming of Redundant Services
- Installation of New Services
- Continuous Flute Auger – Piling
- Horizontal Directional Drilling
- Pit and Pipe Installation Works
- Road, Kerb and Gutter Works
- Concrete Pavement