Malabar Waste Water Treatment Plant

 

2013 – 2014

 PLANT UPGRADE WORKS

 Sydney Water –  4 Malabar Alliance $1.6m                  

  • 8000m3 Bulk Excavation Works – Grit and Screenings
  • Detailed Excavation and Subgrade Preparation for Roads
  • Exhuming of Redundant Services
  • Installation of New Services
  • Continuous Flute Auger – Piling
  • Horizontal Directional Drilling
  • Pit and Pipe Installation Works
  • Road, Kerb and Gutter Works
  • Concrete Pavement